| Index - click below to view Seminar Schedules for that Section Year. | |||||
| 2006 - 2007 | 2001 - 2002 | ||||
| 2005 - 2006 | 2000 - 2001 | ||||
| 2004 - 2005 | 1999 - 2000 | ||||
| 2003 - 2004 | 1998 - 1999 | ||||
| 2002 - 2003 | 1997 - 1998 | ||||
|
||||
| October 6/7, 1997 | ||||
| Topic: | Short-Circuit Calculations/Equip. Rating Review (201) | |||
| Speaker: | Roy Cossé | |||
| Company: | M.W. Kellogg Co [0.5 CEU] | |||
| Time: | 6:00-8:50PM | |||
| Synopsis: | Reviews rotating machinery decrements, computer calcs, "hand" calcs, ANSI standards, and equipment ratings for (201) system | |||
|
|
||||
| October 21/22, 1997 | ||||
| Topic: | Induction Motor Protection (303) |
|||
| Speaker: | Bernie Moisey | |||
| Company: | GE/Multilin [0.5 CEU] | |||
| Time: | 6:00-8:50PM | |||
| Synopsis: | Advanced topics of induction motor protection. Achieving maximum motor capability. | |||
|
|
||||
| November 4/5, 1998 | ||||
| Topic: | Symmetrical Components Application (202) | |||
| Speaker: | William Nichols, | |||
| Company: | West. Elect. Corp. [0.5 CEU] | |||
| Time: | 6:00-8:50PM | |||
| Synopsis: | Reviews typical industrial applications using symmetrical components | |||
|
|
||||
| November 18/19, 1998 | ||||
| Topic: | Switchgear Seminar (204) | |||
| Speaker: | Jim Bowen | |||
| Company: | Powell Elect. Mfg. Co. [0.5 CEU] | |||
| Time: | 6:00-8:50PM | |||
| Synopsis: | Reviews circuit breaker technology and ratings for vacuum, SF6, and air circuit breakers. Includes arc-resistant switchgear design, generator and capacitor applications. | |||
|
|
||||
| January 27/28, 1998 | ||||
| Topic: | Fuse Protection (311) | |||
| Speaker: | Richard Wilson | |||
| Company: | Bussmann Manufacturing and Carey Cook, S&C Electric Company [0.5 CEU] | |||
| Time: | 6:00-8:50PM | |||
| Synopsis: | Fuse coordination for LV and MV fuse applications. Includes up-over-down method. | |||
|
|
||||
| February 10/11, 1998 | ||||
| Topic: | Load Flow/Motor Starting V.D./Accel. Time (203) | |||
| Speaker: | Roy Cossé | |||
| Company: | M.W. Kellogg Co. and William Nichols, West. Elect. Corp. [0.5 CEU] | |||
| Time: | 6:00-8:50PM | |||
| Synopsis: | Reviews load modelling, evaluates power flows and tap changer positions for (201) system, "snapshot V.D." and motor acceleration time examples. | |||
|
|
||||
| February 24/25, 1998 | ||||
| Topic: | Protective Device Coordination (304) | |||
| Speaker: | Roy Cossé | |||
| Company: | M.W. Kellogg Co. [0.5 CEU] | |||
| Time: | 6:00-8:50PM | |||
| Synopsis: | Shows 50/51 device selectivity using (101) system. Reviews solid-grounded, low-R grounded and high-R grounded system applications. | |||
|
|
||||
| March 10/11, 1998 | ||||
| Topic: | Differential Protection (305) | |||
| Speaker: | John Appleyard | |||
| Company: | S&C Electric Company [0.5 CEU] | |||
| Time: | 6:00-8:50PM | |||
| Synopsis: | Reviews MV swgr bus diff, xfmr/gen diff and gnd diff, and pilot wire protection; with worked examples. | |||
|
|
||||
| March 24/25, 1998 | ||||
| Topic: | Generator Protection (306) | |||
| Speaker: | Terry Stringer | |||
| Company: | Basler Electric [0.5 CEU] | |||
| Time: | 6:00-8:50PM | |||
| Synopsis: | Reviews MV and LV relay setting examples. | |||
|
|
||||
| April 14/15, 1998 | ||||
| Topic: | Directional Protection (307) | |||
| Speaker: | William Nichols | |||
| Company: | West. Elect. Corp. and Ken Milligan, GEC Relays [0.5 CEU] | |||
| Time: | 6:00-8:50PM | |||
| Synopsis: | Review of reverse-current, reverse-power and reverse-var relay applications. | |||
|
|
||||
| April 28/29, 1998 | ||||
| Topic: | Current Transformer Saturation (308) | |||
| Speaker: | Roy Cossé | |||
| Company: | M.W. Kellogg Co. and William Nichols, West. Elect. Corp. [0.5 CEU] | |||
| Time: | 6:00-8:50PM | |||
| Synopsis: | Current transformer relaying and metering application considerations for (201) system. | |||
|
||||
|
||||
| Topic: | Battery/Battery Charger Seminar (930) | |||
| Speaker: | Roy Gates | |||
| Company: | ALCAD a Division of SAFT America, Inc. | |||
| Time: | 6:00-8:50PM | |||
| Synopsis: | Reviews battery/battery charger technologies, application and sizing. [0.5 CEU] | |||
|
|
||||
|
||||
| Topic: | Utility Substation Design Seminar (312) | |||
| Speaker: | Al Roach | |||
| Company: | Houston Lighting & Power Company | |||
| Time: | 6:00-8:50PM | |||
| Synopsis: | Overview of utility substation design. Includes grounding, lighting, layout, protection, controls, SCADA, etc. [0.5 CEU] | |||
|
|
||||
|
||||
| Topic: | Startup Testing Seminar (910) | |||
| Speaker: | Powell Scheumack | |||
| Company: | Dashiell Corporation | |||
| Time: | 6:00-8:50PM | |||
| Synopsis: | Startup testing of cable, xfmrs, motors, circuit breakers, swgr, mcc=s, relays, etc. [0.5 CEU] | |||
|
|
||||
|
||||
| Topic: | Surge Protection Seminar (310) | |||
| Speaker: | William Nichols | |||
| Company: | Columbia Broadcasting System | |||
| Time: | 6:00-8:50PM | |||
| Synopsis: | Reviews surge protection theory and application for motors, generators and transformers. [0.5 CEU] | |||
|
|
||||
| January 26/27, 1999 | |||||
| Topic: | Area Classification Seminar (901) | ||||
| Speaker: | Michael Alford and Robert Zerda | ||||
| Company: | Texaco Inc. | ||||
| Time: | 6:00-8:50PM | ||||
| Synopsis: | Reviews select API-500 topics and considerations. [0.5 CEU] | ||||
|
|
|||||
| February 2/3, 1999 | |||||
| Topic: | Power System Harmonics Seminar (502) | ||||
| Speaker: | David Rice | ||||
| Company: | General Electric Company | ||||
| Time: | Feb. 2/3, 1999 6:00-8:50PM | ||||
| Synopsis: | Reviews power system harmonics theory and application. [0.5 CEU] | ||||
|
|
|||||
| February 16/17, 1999 | |||||
| Topic: | Power System Harmonic Filters Seminar (503) | ||||
| Speaker: | David Rice | ||||
| Company: | General Electric Company | ||||
| Time: | 6:00-8:50PM | ||||
| Synopsis: | Reviews theory and application of power system harmonic filters. [0.5 CEU] | ||||
| Special Note: | ATTENDEES ARE ASKED TO BRING A LAPTOP COMPUTER, WITH A FLOPPY DRIVE AND WHICH CONTAINS MICROSOFT EXCEL, TO THE SECOND NIGHT OF THE SEMINAR (WEDNESDAY, FEBRUARY 17) | ||||
|
|
|||||
| March 2/3, 1999 | |||||
| Topic: | Generator Application Seminar (602) | ||||
| Speaker: | Tom Hammer | ||||
| Company: | Ideal Electric | ||||
| Time: | 6:00-8:50PM | ||||
| Synopsis: | Reviews synchronous generator theory, standards and application. [0.5 CEU] | ||||
|
|
|||||
|
|||||
| Topic: | Generator Controls Seminar (603) | ||||
| Speaker: | Fred Wolf | ||||
| Company: | Basier Electric | ||||
| Time: | 6:00-8:50PM | ||||
| Synopsis: | Reviews modern generator excitation and control schemes and applications [0.5 CEU] | ||||
|
|
|||||
| March 23/24 , 1999 | |||||
| Topic: | Power Generation/Isolated Sys. Seminar (313) | ||||
| Speaker: | Peter Evjen | ||||
| Company: | Solar Turbines Incorporated | ||||
| Time: | 6:00-8:50PM | ||||
| Synopsis: | Reviews system arrangements, governor/ automatic volt. reg. control, protection, and utility interface considerations. [0.5 CEU] | ||||
|
|
|||||
| April 6/7 , 1999 | |||||
| Topic: | Inplant Gen./Utility Interface Seminar (309) | ||||
| Speaker: | Terry Stringer | ||||
| Company: | OMICRON electronics Corporation USA | ||||
| Time: | 6:00-8:50PM | ||||
| Synopsis: | Reviews utility-tie xfmr protection considerations with inplant generators. [0.5 CEU] | ||||
|
|
|||||
| April 20/21, 1999 | |||||
| Topic: | National Electrical Code Seminar (920) | ||||
| Speaker: | William Nichols | ||||
| Company: | Columbia Broadcasting System | ||||
| Time: | 6:00-8:50PM | ||||
| Synopsis: | Reviews selected National Electrical Code topics.[0.5 CEU] | ||||
|
|||||
| Topic: | Generator Controls Seminar (603) | ||||
| Speaker: | Fred Wolf | ||||
| Company: | Basier Electric | ||||
| Time: | 6:00-8:50PM | ||||
| Synopsis: | Reviews modern generator excitation and control schemes and applications [0.5 CEU] | ||||
|
| October 5/6, 1999 | ||
|
|
Topic: |
ANSI Circuit Bkr
Short-Circuit Selection (205) |
|
|
Speaker: |
Roy Cosse’ |
|
|
Company:
|
Kellogg Brown & Root,
Inc. |
|
|
Time: |
6:00-8:50PM |
|
|
Synopsis: |
System examples show
ANSI circuit breaker selection methodology. Includes IEC MV circuit breaker
comments. [0.5 CEU] |
|
| ||
|
October 19/20,
1999 | ||
|
|
Topic: |
Symmetrical
Components Application (202) |
|
|
Speaker: |
William Nichols |
|
|
Company:
|
Siemens Westinghouse
Technical Services, Inc. |
|
|
Time: |
6:00-8:50PM |
|
|
Synopsis: |
Reviews
typical industrial applications using symmetrical components. [0.5
CEU] |
|
| ||
|
November 2/3,
1999 | ||
|
|
Topic: |
Power
System Grounding (401) |
|
|
Speaker: |
Jim
Bowen |
|
|
Company:
|
Powell
Electrical Manufacturing Co. |
|
|
Time: |
6:00-8:50PM |
|
|
Synopsis: |
Reviews
solid-grounded, low-R grounded and high-R grounded system application [0.5
CEU] |
|
| ||
|
November 16/17, 1999 | ||
|
|
Topic: |
Medium Voltage Switchgear Seminar (204) |
|
|
Speaker: |
Jim Bowen |
|
|
Company: |
Powell Electrical Manufacturing Co. |
|
|
Time: |
6:00-8:50PM |
|
|
Synopsis: |
Review circuit breaker technology and ratings for vaccum, SF6, and air circuit breakers. Includes arc-resistant switchgear design, generator and capacitor applications. [0.5 CEU] |
|
| ||
|
| ||
|
|
Topic: |
Large Motor Starting Methods (206) |
|
|
Speaker: |
William Nichols |
|
|
Company: |
Siemens Westinghouse Technical Services, Inc. |
|
|
Time: |
6:00-8:50PM |
|
|
Synopsis: |
Reviews large motor starting methods, DOL, captive xfmr, autoxfmr, capacitor start, wye-delta, solid-state soft start. [0.5 CEU] |
|
| ||
|
| ||
|
|
Topic: |
Protective Device Coordination (304) |
|
|
Speaker: |
Roy Cosse’ |
|
|
Company: |
Kellogg Brown & Root, Inc. |
|
|
Time: |
6:00-8:50PM |
|
|
Synopsis: |
Relaying overview of a complete power system including a brief discussion of primary and backup protection. Time-current curve examples show 50/51 device system selectivity. [0.5 CEU] |
|
| ||
|
February 19, 2000 | ||
|
|
Topic: |
Advanced Induction Motor Protection(303) |
|
|
Speaker: |
Bernie Moisey |
|
|
Company: |
GE/Multilin |
|
|
Time: |
9:00-3:30PM |
|
|
Synopsis: |
Reviews
advanced topics of induction motor protection to achieve maximum motor
capability. [0.5 CEU] Note:
Hot breakfast and lunch will be provided. |
|
| ||
|
March 7/8, 2000 | ||
|
|
Topic: |
Differential Protection Relaying Systems (305) |
|
|
Speaker: |
John Appleyard |
|
|
Company: |
S&C Electric Co. |
|
|
Time: |
6:00-8:50PM |
|
|
Synopsis: |
Reviews MV swgr bus diff, xfrmr/gen diff and gnd diff. Includes worked examples. [0.5 CEU] |
|
| ||
|
March 21/22, 2000 | ||
|
|
Topic: |
Directional Protection and CT Saturation (314) |
|
|
Speaker: |
William Nichols |
|
|
Company: |
Siemens Westinghouse Technical Services, Inc. |
|
|
Time: |
6:00-8:50PM |
|
|
Synopsis: |
Review
of reverse-current, reverse-power and reverse-var relay applications. Reviews CT relaying and metering
application considerations. [0.5 CEU] |
|
| ||
|
April 4/5, 2000 | ||
|
|
Topic: |
Implant Gen. And Electric Utility Connection (606) |
|
|
Speaker: |
Peter Evjen |
|
|
Company: |
Solar Turbines Inc. |
|
|
Time: |
6:00-8:50PM |
|
|
Synopsis: |
Reviews
implant generation connected to a utility. Discusses utility interconnection
requirements, neutral grounding methods, protection, synchronization, real
power and reactive power control. [0.5 CEU] |
|
| ||
|
April 18/19, 2000 | ||
|
|
Topic: |
Power Transformers – Factory/Field Testing (911) |
|
|
Speaker: |
Randolph Rensi |
|
|
Company: |
Waukesha Electrical Systems, Inc. |
|
|
Time: |
6:00-8:50PM |
|
|
Synopsis: |
Reviews ANSI factory tests and typical field startup testing considerations. [0.5 CEU] |
|
| ||
| May
2/3,
2000 | ||
|
|
Topic: |
Directional Protection and CT Saturation (314) |
|
|
Speaker: |
William Nichols |
|
|
Company: |
Siemens Westinghouse Technical Services, Inc. |
|
|
Time: |
6:00-8:50PM |
|
|
Synopsis: |
Review
of reverse-current, reverse-power and reverse-var relay applications. Reviews CT relaying and metering
application considerations. [0.5 CEU] |
|
| ||||
| ||||
|
Oct. 3/4, 2000 | ||||
|
|
Topic: |
Battery/Battery Chargers (930) | ||
|
|
Speaker: |
Roy Gates | ||
|
|
Company: |
ALCAD | ||
|
|
Time: |
6:00-8:50PM | ||
|
|
Synopsis: |
Reviews
battery and battery charger technologies, application and sizing | ||
|
| ||||
|
Oct.
17/18, 2000 | ||||
|
|
Topic: |
|||